Home › Forum › Ask A Member › Testing timing of Red Atom Modules › Re: Testing timing of Red Atom Modules

#77156
rudderless
Participant

    I made a plate out of some Bakelite and mounted the Atoms on it. The plate with the Atoms is mounted outside the motor using the spark coil mounting screws. All I had to do is remove caps and the moving point thing. The point base was left in and was used as a terminal block. The plate also had a piece of terminal block for the spark coil connections.

    After about 100 hours one Atom went AWOL so I went back to points. I might ..this winter…make a couple of point eliminators on that bakelite plate and pot it somehow.